Toyota Financial Services West Expansion

Toyota Financial Services West Expansion
Location
Chandler, AZ
Size
110,000 SF
Architect
Ware Malcomb
Services
Electrical Systems
Lighting Design
Mechanical Systems
Plumbing and Piping Systems

This project encompasses the significant remodel of office space within an existing multi-story building.

Säzän Group provided MEP engineering design services across three phases of tenant improvements at Toyota Financial Services West, totaling over 110,000 SF across the first, second, and third floors of an existing multi-story building. Each phase modernized office layouts for functionality and cohesion.

We prioritized retaining and reusing as much of the existing mechanical system as possible. Most of the water source heat pumps were kept in their original locations, along with portions of the existing ductwork across several systems. This approach both achieved significant time and cost savings to the owner and ensured an efficient, well-optimized system design.