Evergreen High School Value Engineering and Cx Services

Location
Seattle, WA
Size
214,000 SF
Owner
Highline Public Schools
Services
Commissioning
Value Engineering

Säzän Group supported the Highline Public Schools capital program by facilitating a Value Engineering (VE) Study for Evergreen High School, which is slated to open September 2025, and later provided commissioning services.

The VE study proposed $26 million in savings. Commissioned systems included HVAC, plumbing, lighting, photovoltaic array, security, fire alarm, gymnasium equipment, and kitchen equipment.