Projects > VAMC Seattle

VAMC SEATTLE NEW WEST CAMPUS POWER SERVICE

VA PUGET SOUND HEALTH CARE SYSTEM

Seattle, Washington

Services
Prime consultant; led team of architectural, structural, and civil subconsultants; full mechanical and electrical engineering and design, project management, construction administration.

Project
Säzän Group was the prime consultant for a $9 million upgrade to the medium-voltage electrical distribution system serving twelve buildings at the Seattle VA medical center campus. The upgrade included replacing the old 5 kV distribution equipment and two secondary unit substations with new 13.8 kV, 5 mVA substation and associated distribution switchgear designed to parallel two 2.5 mW engine-generators with the serving utility; five padmount utilization transformers; and 15 kV underground distribution cabling. Work included a detailed existing conditions study and power study of the campus buildings.

Project also included design and construction of a new 3,100 SF building to house two 2.5 mW engine-generators and 15 kV distribution switchgear to replace the antiquated 5 kV facilities and equipment.

The project required detailed scheduling of multiple tasks and careful phasing of the work to ensure hospital systems were online and powered throughout the construction period.

VAMC Seattle New Emergency Generator Building

Seattle, WA